KJ616 钻孔应力监测系统安装调试方法
1、测力传感器采用穿孔式固定安装安装。将传感器安装锚杆的托盘和紧固螺母之间,传感器安装时要注意居中,偏离中心安装时会造成一定的测量误差。建议传感器在巷道掘进过程中安散艉九慊装,若在回采巷道锚杆上安装传感器时,要注意局部顶板安全。The force transducer is installed with a perforated fixed installation.Install the sensor on the anchor tray and tighten the screw.When the sensor is installed between the mother and the mother, the center should be taken care of, and the deviation from the center will cause a certain measurement error.It is suggested that the sensor should be installed in the roadway tunneling process. If the sensor is installed on the roadway bolt, please note.Local roof safety.

3、 按照图 2 的接线方式,将传感器信号线与KJ616-F 矿用数据通讯分站总线上三通接线盒相连,电缆线按颜色一一对应连接。2) According to the wiring mode of figure 2, the sensor signal line and the kj616-f mining data communication station bus are used.Connect the three junction box, and the cable is connected by color.